Method of manufacture is as follows. C one side of the pipe weld up or sealed. Aluminum piston cut the hole pipe, which is necessary to provide a handle (the rod at the same time is the length of the pipe). In the sealed portion of the pipe drill a hole into which soldered fitting a rubber hose, the other… (more…)